Ballot Period

Parts Overview

Go back to the overview of all available parts.

Part 7-420 (2008; DER)

ID Subject Cat Status Page Clause Paragraph Created Last Comment Proposer
1424 Logical Node XFUS moved to IEC 61850-7-4 Ed. 2.1 Ed2 Ballot Period 84-85 8.3.2 16 Jul 15 16 Jul 15 C. Fleischer
1183 Power level to activate volt-var function Ed2 Ballot Period 90-7 Clause 6.2.2 28 Oct 13 10 Jul 15 F. Cleveland
1182 L/H Frequency Ride-Through Ed2 Ballot Period 28 Oct 13 10 Jul 15 F. Cleveland

Part 90-7 (2013; Edition 1, DER power converters)

1210 Current (vs. power) ramp rate Ed2 Ballot Period 79 8.4.2.1 Table 19 29 Jan 14 10 Jul 15 C. Eich
1125 Addition of frequency ride-through Ed2 Ballot Period 21 May 13 07 Oct 13 F. Cleveland

Part 9-3 (Precision Time Protocol Profile)

1608 Daylight saving time indication Ed2 Ballot Period none yet 30 Dec 17 08 Nov 18 H. Kirrmann

Part 8-2 (2018)

1664 Figure 37 – XML structure of GetDataDirectory-Request Ballot Period 83 13.4.1 30 Aug 19 11 Sep 19 M. Breuers
1662 Associate Response Ballot Period 63 10.2.2.1.1 29 Aug 19 11 Sep 19 M. Breuers

 

Privacy | Contact | Disclaimer

Tissue DB v. 21.11.6.1