Several data object (DO) names containing "Var" have to be changed to "VAr", to be consistent with the abbreviation "VAr" defined in IEC 61850-7-4, clause 4.
[Decided by WG 17 IEC 61850-7-420 UML Task Force]
This change affects the following data objects:
- DOPR.ECPNomVarRtg
- DOPM.OpModConVar and DOPM.OpModMaxVar
- DRCT.MaxVarLim
- DRCC.OutVarSet and DRCC.MaxVarLim
- DRAT.VarRtg and DRAT.MaxVarOut
- ZINV.VarRtg
Proposal
- Change DOPR.ECPNomVarRtg to DOPR.ECPNomVArRtg
- Change DOPM.OpModConVar and DOPM.OpModMaxVar to DOPM.OpModConVAr and DOPM.OpModMaxVAr, resp.
- Change DRCT.MaxVarLim to DRCT.MaxVArLim
- Change DRCC.OutVarSet and DRCC.MaxVarLim to DRCC.OutVArSet and DRCC.MaxVArLim, resp.
- Change DRAT.VarRtg and DRAT.MaxVarOut to DRAT.VArRtg and DRAT.MaxVarOut, resp.
- Change ZINV.VarRtg to ZINV.MaxVArRtg