1130 SICS substation sectionCreated: 06 Jun 2013 Status: Not Applicable Part: Part 6 (2009-12; Edition 2) Links: Page: SICS Clause: Paragraph: Category: No impact on this part Issue As discussed at WG10 meeting stPetersburg the SICS is not-consistent with the contents of the part 6. It states the SCD shall have the substation section but the SICS for system tool states its all optional. Proposal Make it conditional that a system tool either import SSD from another tool (S41) or edit/create the substation section (S45)
Privacy | Contact | Disclaimer Tissue DB v. 24.12.6.1 |