Conflict between IEC 61850-7-420 and IEC 61400-25-6 (TC88 JWG25) data object (DO) name abbreviations:
- In IEC 61850-7-420: 'Plnt' means 'Plant, facility'
It is used in total of 6 DO names in LN DCRP
- In IEC 61400-25-6: 'Pl' means 'Plant'
Proposal
- Drop the abbreviation 'Plnt' and use 'Pl' instead
- Rename DCRP.PlntOblSelf to DCRP.PlOblSelf
- Rename DCRP.PlntOblBck to DCRP.PlOblBck
- Rename DCRP.PlntOblMan to DCRP.PlOblMan
- Rename DCRP.PlntOblMrk to DCRP.PlOblMrk
- Rename DCRP.PlntOblUtil to DCRP.PlOblUtil
- Rename DCRP.PlntOblEm to DCRP.PlOblEm
[Decided by WG 17 IEC 61850-7-420 UML Task Force]