Every status a technical issue can be in, and the steps the workflow allows between them. The status this tissue is in now is the box drawn in bold.

Hide the workflow

TissueDB status workflow back to Discussion Batch Triage Accepted Discussion Drafting Implementation Verify Draft Implementation Analysis Of Compatibility Conformance Test Preparation Conformance Test Verification Ballot Period Solution Accepted Must Implement In Force Approval (N/A) Approval (Duplicate) Approval (Editorial) Approval (Future Improvement) Not Applicable Duplicate Future Improvement Editorial Must Implement (Editorial) In Force (Editorial) Legend normal route of a technical solution accepted or released → in force classification branch (working group approval) back to Discussion for rework (lines are bundled) reaching the final state
The route a technical solution takes from Triage to In Force, the working group approvals that close an issue instead, and the ways back to Discussion for rework. Opens full size in a new tab.

555 LN KFAN.SptSpt

Created
15 Oct 2007
Status
TriageNew, and not yet classified. The working group decides whether to take it forward as a technical issue or to close it. Hide the workflow
Part
Part 7-410 (2007; Hydro Power)
Links
None
Page
Clause
Paragraph
Category
Issue for edition 2 of this part

Issue

SpdSpt uses CDC APC but “control” operations are not needed

Proposal

Change to CDC ASG

DiscussionCreated
Triage OK - however the data item name is SpdSpt 19 Oct 07