Every status a technical issue can be in, and the steps the workflow allows between them. The status this tissue is in now is the box drawn in bold.

Hide the workflow

TissueDB status workflow back to Discussion Batch Triage Accepted Discussion Drafting Implementation Verify Draft Implementation Analysis Of Compatibility Conformance Test Preparation Conformance Test Verification Ballot Period Solution Accepted Must Implement In Force Approval (N/A) Approval (Duplicate) Approval (Editorial) Approval (Future Improvement) Not Applicable Duplicate Future Improvement Editorial Must Implement (Editorial) In Force (Editorial) Legend normal route of a technical solution accepted or released → in force classification branch (working group approval) back to Discussion for rework (lines are bundled) reaching the final state
The route a technical solution takes from Triage to In Force, the working group approvals that close an issue instead, and the ways back to Discussion for rework. Opens full size in a new tab.

1814 Editorial improvement

Created
14 Mar 2022
Status
In Force (Editorial)Closed: the editorial correction is part of the standard. No further comments are taken. Hide the workflow
Batch
57/2673/INFThis tissue went out with this batch, which was closed on 01 Apr 2024.
Part
Part 8-1 (2020; Edition 2.1)
Links
None
Page
167 of INF
Clause
25.3.2
Paragraph
last

Issue

The first sentence of this paragraph appears to be mistyped.
In the last sentence of this paragraph the word "Impementations" has a typo.

Proposal

Propose to change the first sentence to "Configurations compliant with previous versions of the standard may not contain ..." (= 3 modifications).

Change "Impementations" to "Implementations".

Propose to arrange this last sentence as an extra paragraph in the clause, as MAC-Address is not related to MinTime/MaxTime.

DiscussionCreated
In Force (Editorial) Batch '57/2673/INF' (2) closed 01 Apr 24
Editorial Approve 11 Oct 22
Approval (Editorial) I agree with the editorial comment. 03 Aug 22