46   Synchro check cancel

Created: 15 Mar 2005

Status: In Force (green)

Part: Part 7-2 (2003)

Links:

Page:

Clause: 17.3.3

Paragraph: Figures 33, 34

Category: Issue may impact interoperability of implementations of Edition 1

Issue

For the synchro-check functionality it is necessary to cancel the command sequence after an oper_req command is given. In this case the synchro-check is running and waiting for the switch on conditions (frequency, voltage has to be within the permitted range) Relating to the given state machine this status is in between “ready” and “WaitForChange” waiting for Oper_resp +.

Proposal

GoE-meeting 28.10.04:
Final proposal
There is no possibility for Canceling a command as long as no Oper_resp+ has been received. New state diagram as a proposal for the next meeting will be prepared by Siemens.
GoE-meeting 1.11.04:
Proposal will be verified and comment by George via email.
see Annexe A of
<<61850-7-2_IS-Ed1_comment_clarified_V1.1_5January05.doc>>

Discussion Created Status
17 Feb 07 In Force (green)
Based on Editor meetings in Livonia February 2006 and December 2006, the state diagram hass been further improved 15 Dec 06 Ballot Period
Editor meeting has found some issues with the previous final proposal. An updated state diagram will be provided during this editor meeting 14 Feb 06 Discussion (red)
Sorry ... this ís still "final proposal" ! 18 Aug 05 Ballot Period
Proposal accepted.
Changed to green.
18 Aug 05 In Force (green)
Postponed ballot time 18 Aug 05 Ballot Period
State machine included
Ballot opened
18 Aug 05 Ballot Period
Final Proposal.
State machine has been actualized.
Link to the state machine drawing will be added asap.
01 Apr 05 Ballot Period

 

Privacy | Contact | Disclaimer

Tissue DB v. 23.12.13.1